Perform an anti-liquefaction mitigation treatment In Fos-sur-Mer, for the construction of a liquefied natural gas complex, Menard performed an anti-liquefaction mitigation treatment for the dock by increasing the embankment’s density using compaction grouting technique. This was an innovative operation as the equipment used for this technique was the Controlled Modulus Columns equipment which led [...]
Port of Dunkirk, France
Sophie Fromion2021-07-01T12:10:33+02:00"Stand-down" operation for the reinforcement of the Freycinet 8 quay The project aimed to reinforce the quay under the crane circulation area used to unload wind turbine from boats. The 6,500 sq. metre area, composed of loose and dense sand down to 5 m, had to be executed in less than 3 weeks. Menard’s [...]